MCZ Musa Air 2011 Manual

MCZ Komfur Musa Air 2011

Læs gratis den danske manual til MCZ Musa Air 2011 (65 sider) i kategorien Komfur. Denne vejledning er vurderet som hjælpsom af 37 personer og har en gennemsnitlig bedømmelse på 4.3 stjerner ud af 19 anmeldelser. Har du et spørgsmål om MCZ Musa Air 2011, eller vil du spørge andre brugere om produktet?

Side 1/65
8901166500
INSTALLATION AND
USE MANUAL
EN
Downloaded from www.Manualslib.com manuals search engine
PELLET STOVES Chapter 1
INSTALLATION AND USE MANUAL
page 2
Introduction Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
INTRODUCTION ....................................................................................................................................4
1. WARNINGS AND GUARANTEE CONDITIONS.....................................................................................5
1.1. SAFETY INSTRUCTIONS..................................................................................................................5
1.2. OPERATING WARNINGS..................................................................................................................6
1.3. IMPORTANT INFORMATION FOR CORRECT DISPOSAL OF THE PRODUCT IN ACCORDANCE WITH EC
DIRECTIVE 2002/96/EC.............................................................................................................................7
1.4. GUARANTEE CONDITIONS ..............................................................................................................7
1.4.1. Limitations...............................................................................................................................8
1.4.2. Exclusions................................................................................................................................8
2. THEORETICAL NOTIONS FOR INSTALLATION ..................................................................................9
2.1. PELLETS ........................................................................................................................................9
2.2. PRECAUTIONS FOR INSTALLATION................................................................................................10
2.3. OPERATING AREA.........................................................................................................................11
2.4. CONNECTION TO THE EXTERNAL AIR INTAKE................................................................................12
2.5. CONNECTION OF SMOKE DISCHARGE PIPE....................................................................................12
2.6. CONNECTION TO THE FLUE PIPE...................................................................................................14
2.7. CONNECTION TO AN EXTERNAL FLUE WITH INSULATED OR DOUBLE-WALL PIPE.............................14
2.8. CONNECTION TO THE FLUE PIPE...................................................................................................14
2.9. OPERATING PROBLEMS CAUSED BY DRAUGHT DEFECTS IN THE FLUE.............................................15
3. INSTALLATION AND ASSEMBLY......................................................................................................16
3.1. DRAWINGS AND TECHNICAL CHARACTERISTICS............................................................................16
3.1.1. Dimensions CLUB mod. AIR – COMFORT AIR............................................................................16
3.1.2. Dimensions SUITE mod. AIR – COMFORT AIR ..........................................................................16
3.1.3. Dimensions MUSA mod. AIR- COMFORT AIR.............................................................................17
3.1.4. Dimensions TOBA mod. AIR-COMFORT AIR..............................................................................17
3.1.5. Dimensions SAGAR mod. AIR ..................................................................................................18
3.1.6. Dimensions NIMA mod. COMFORT AIR.....................................................................................19
3.1.7. Technical characteristics .........................................................................................................20
3.2. PREPARATION AND UNPACK ING...................................................................................................22
3.3. CONNECTIONS OF HOT AIR DUCTS FOR SUITE/CLUB/MUSA/NIMA AND TOBA COMFORT AIR MODEL 25
3.4. INSTALLATION OF CERAMIC CLADDING FOR SUITE AND CLUB........................................................26
3.4.1. Assembly of the lower panel – Suite and Club Stoves ................................................................26
3.4.2. Installation of side tiles...........................................................................................................27
3.4.3. Installation of ceramic top.......................................................................................................27
3.4.4. Assembly of sides on the MUSA stove ......................................................................................28
3.4.5. Assembly of ceramic side tiles onto NIMA stove........................................................................29
3.4.6. Assembling the frontal/side panel and top on the Toba stove.....................................................30
3.4.7. Assembling side panels and top on the Sagar stove...................................................................33
3.5. INSTALLATION OF AIR FILTER ......................................................................................................35
3.6. OPENING/CLOSING OF ATHOS STOVE DOOR..................................................................................35
3.7. MAKING THE ELECTRICAL CONNECTIONS......................................................................................35
4. OPERATION .....................................................................................................................................36
4.1. PRE-LIGHTING WARNINGS............................................................................................................36
4.2. PRE-LIGHTING CHECK ..................................................................................................................37
4.2.1. Note on first ignition...............................................................................................................37
4.3. LOADING THE PELLETS.................................................................................................................37
5. LCD REMOTE CONTROL ...................................................................................................................38
5.1. Characteristics of the remote control ..............................................................................................38
5.2. Graphic appearance......................................................................................................................38
5.3. Operation of the remote control.....................................................................................................39
5.3.1. General rules .........................................................................................................................39
5.4. Initial settings...............................................................................................................................39
Downloaded from www.Manualslib.com manuals search engine


Produkt Specifikationer

Mærke: MCZ
Kategori: Komfur
Model: Musa Air 2011

Har du brug for hjælp?

Hvis du har brug for hjælp til MCZ Musa Air 2011 stil et spørgsmål nedenfor, og andre brugere vil svare dig