Læs gratis den danske manual til Festo VABM-B10-20EEE-G38-2-P3 (1 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 13 personer og har en gennemsnitlig bedømmelse på 3.6 stjerner ud af 7 anmeldelser. Har du et spørgsmål om Festo VABM-B10-20EEE-G38-2-P3, eller vil du spørge andre brugere om produktet?

Side 1/1
Assembly instructions (Original instructions)
8069064
1702b
[8069066]
†‡
Connection block
VABM-B10-20EEE
Festo SE & Co. KG
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
1. Applicable documents
All available documents on the product www.
festo.com/pk
2. Safety
Switch off compressed air before mounting work.
Observe tigh
tening torques.
3. Intended use
Pneuma
tic linking of the valves.
4. Further inf
o
rmation
Accessories for VABM www.fes
to.com/catalogue
5. Scope of delivery
2027
6d
_1
VABM-B10-20EEE-...
1 Connection block
2 Screw M3x40
1)2)
3 Screw M5
4 Seal
1)2)
5 Seal
1)
6 O-ring 17x2
7 O-ring 10x2
(1x)
(nx)
(2x)
(nx)
(nx)
(3x)
(2x)
2027
6d
_2
VABM-B10-20EEE-...-P3
1 Connection block
2 Screw M3x40
1)2)
3 Screw M5
4 Seal
1)
5 Seal
1)
6 O-ring 17x2
7 O-ring 10x2
(1x)
(nx)
(3x)
(nx)
(nx)
(2x)
(1x)
6. Not in scope of d
e
livery
20260d_3
8 Solenoid valve
VUVS-… or
pneumatic valve
VUWS-...
1)
9 Screw set
1)
VABM-B10-20-S
only for VUVS-LK…-S,
with screws
ISO 4762-M3x30-8.8
(nx)
(nx)
2027
2d
_1
3
1)
The number of screws , seals 2 9/4 5/ and valves 8 is dependent on the available
valve positions.
2)
Number = 2 x available valve positions
7. Mounting of O-rings 6
6
6
66/7
7
7
77
20276d_3
Place greased O-rings 6 7/
into the depressions.
8. Mounting of connection b
l
ock 1
1
1
11
20276d_4
Place connection block 1
on mounting surface (A).
Push connection block 1
onto the connection
block (B).
Check: O-rings 6 7/ are
seated in the depressions.
Tighten screws 3.
9. Alignment of seal 5
5
5
55
20272d_8
For valves VUVS-L/LT...:
Place the seal 5 in the
depression of the valve 8
so it is positive-locking.
Observe channel
designation 1/3/5 or 1/3.
2027
2d_12
For valves VUVS-LK...-S:
Place seal 5 on the
valve 8. Observe channel
designation 1/3/5 or 1/3.
Indexing hole (X) on the
valve 8 is:
Only relevant for connection
block VABM-B10-20EEE-...
Hidden after alignment
of the seal 5.
10. Mounting the valve 8
8
8
88
Information
Screws 9 can only be mounted with solenoid valves 8 VUVS-LK…-S.
Seals 4 can only be mounted for solenoid valves 8 with external pilot
air supply.
20276d_5
/Push screws 2 9 into the
drill holes of the valve 8.
Only screws 2 are loss-
protected.
Insert seals 4 into the
orifices (C). Rotating
movement required during
mounting.
Position valve 8 on the
connection block 1.
Check:
Projection (D) is in the
slot (E)
Valve 8 is aligned parallel
to the surface (F)
Channel designations 1/3/5
or 1/3 agree with each
other.
Tighten screws 2 9/ .
1.4 Nm _ 20%
3
1
6
7
2
3
5
1
6
7
2
3
A
B
8
5
4
C
E
4
4
5
7
6
1
4.3 Nm _ 20 %
1
F
8
5
D
315
2
/
9
8
5
D
315
X
X
X
8
9


Produkt Specifikationer

Mærke: Festo
Kategori: Ikke kategoriseret
Model: VABM-B10-20EEE-G38-2-P3

Har du brug for hjælp?

Hvis du har brug for hjælp til Festo VABM-B10-20EEE-G38-2-P3 stil et spørgsmål nedenfor, og andre brugere vil svare dig




Ikke kategoriseret Festo Manualer

Ikke kategoriseret Manualer

Nyeste Ikke kategoriseret Manualer

Nokia

Nokia CH-100 Manual

17 December 2025
Miele

Miele DKF 31-S Manual

17 December 2025
Aqprox

Aqprox appLS24 Manual

17 December 2025
Vaxcel

Vaxcel T0440 Manual

17 December 2025
TOTO

TOTO TSU08W Manual

17 December 2025
Vaxcel

Vaxcel T0702 Manual

17 December 2025
Wine-Mate

Wine-Mate WM-6500SSD Manual

17 December 2025