Friedrich ZoneAire Premier PDH15K5SG Manual
Friedrich
Klimaanlæg
ZoneAire Premier PDH15K5SG
Læs nedenfor 📖 manual på dansk for Friedrich ZoneAire Premier PDH15K5SG (37 sider) i kategorien Klimaanlæg. Denne guide var nyttig for 22 personer og blev bedømt med 4.5 stjerner i gennemsnit af 11.5 brugere
Side 1/37

Installation and Operation Manual
THE E XP ERTS IN RO OM AI R CONDI T IONIN G
230 VOLT PDH09K3SGR3, PDH12K3SGR3
265 VOLT PDH09R3SGR3, PDH12R3SGR3
Chassis Models
ZoneAire Premier® R-32 Series
PTAC
Packaged Terminal Air
Conditioners & Heat Pumps

2
US
C
A. IMPORTANT SAFETY AND GENERAL INFORMATION .................3
A.1 Introduction 3 .............................................................................
A.2 • Safety Warnings 3 ...................................................................
A.3 Warning For Using R32 Refrigerant 5 .....................................
A.4 Importance of a Quality Installation 7 .....................................
A.5 Product Inspection 7 .................................................................
A.5 Model Identification Guide 7 .....................................................
A.6 Unit Features 7 ...........................................................................
B. SPECIFICATIONS ................................................................................. 9
B.1 Major Components and Dimensions 9 ....................................
B.2 Product Data Information 9 .....................................................
C. INSTALLATION OF THE UNIT ...........................................................10
C.1 Pre-Installation Checkpoints 10 ...............................................
C.3 Choosing a Location 11 ..............................................................
C.4 Install Unit 13 .............................................................................
C.4.2 External Drain Kit Installation 14 .........................................
C.4.3 Wall Sleeve Installation Instructions (PDXWS) ..............................15
C.4.4 Standard Grille Instructions 19 .............................................
C.5 Chassis Install 20 .......................................................................
E. ELECTRICAL ........................................................................................22
E.1 Electrical Safety Information 22 ...............................................
E.2 Power Cord LCDI Test 22 .........................................................
E.3 Electrical Wiring ...........................................................................................23
E.4 How To Connect 25 .....................................................................
F. REMOTE THERMOSTATS...................................................................26
F.1 Install Thermostat ........................................................................................26
F.2 Terminal Connections 27 ...........................................................
J. STARTUP AND OPERATION ..............................................................27
J.1 Final Inspection 27 .....................................................................
J.2 Air Flow Selection and Adjustment 28 ....................................
J.3 Dip Switches 29 ..........................................................................
J.4 Control Panel Operation 30 .......................................................
J.5 Allocation Mode 31 .....................................................................
M. TROUBLESHOOTING .........................................................................32
M.1. Troubleshooting Tips 32 ......................................................
M.2 Diagnostic Codes 33 .............................................................
P. ACCESSORIES .....................................................................................34
R . INFORMATION FOR THE OWNER ...................................................36
R.2 Routine Maintenance 36 ...........................................................
R.3 Qualification Of Workers 36 ......................................................
R.3 Warranty 37 ................................................................................
CAUTION: Do Not Operate Equipment During Active Stages Of Construction
To ensure proper operation, Friedrich requires that all equipment is not operated during active construction phases. This includes active
stages of completing framing, drywalling, spackling, sanding, painting, flooring, and moulding in the equipment’s designated conditioning
space. The use of this equipment during construction could result in premature failure of the components and/or system and is in violation of
our standard warranty guidelines. The operation of newly installed equipment during construction will accelerate the commencement and/or
termination of the warranty period.
Register your Air Conditioner
Model information can be found on the name plate.
Please complete and mail the owner registration card furnished
with this product, or register online at www.friedrich.com.
For your future convenience, record the model information .
Model Number ________________________
Serial Number ________________________
Produkt Specifikationer
Mærke: | Friedrich |
Kategori: | Klimaanlæg |
Model: | ZoneAire Premier PDH15K5SG |
Har du brug for hjælp?
Hvis du har brug for hjælp til Friedrich ZoneAire Premier PDH15K5SG stil et spørgsmål nedenfor, og andre brugere vil svare dig
Klimaanlæg Friedrich Manualer

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025

20 Februar 2025
Klimaanlæg Manualer
- Klimaanlæg Thomson
- Klimaanlæg Elba
- Klimaanlæg Infiniton
- Klimaanlæg Xiaomi
- Klimaanlæg Emmeti
- Klimaanlæg EcoFlow
- Klimaanlæg Hotpoint
- Klimaanlæg CyberPower
- Klimaanlæg Avidsen
- Klimaanlæg Aertesi
- Klimaanlæg RCA
- Klimaanlæg Perfect Aire
- Klimaanlæg Mestic
- Klimaanlæg Carrier
- Klimaanlæg Termozeta
Nyeste Klimaanlæg Manualer

10 Juni 2025

9 Juni 2025

9 Juni 2025

9 Juni 2025

9 Juni 2025

9 Juni 2025

9 Juni 2025

9 Juni 2025

8 Juni 2025

8 Juni 2025