Hestan GRC30 Manual


Læs gratis den danske manual til Hestan GRC30 (7 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 35 personer og har en gennemsnitlig bedømmelse på 4.4 stjerner ud af 18 anmeldelser. Har du et spørgsmål om Hestan GRC30, eller vil du spørge andre brugere om produktet?

Side 1/7
©2018 Hestan Commercial Corporation
1
EN
REFRESHMENT CENTER /
INSULATED SINK
Installation Instructions
GRC / GRCHS / GIS / GISHS / AGIB
IMPORTANT - READ ALL INSTRUCTIONS BEFORE YOU BEGIN
INSTALLER SHOULD LEAVE THESE INSTRUCTIONS WITH THE HOMEOWNER
Some parts have sharp edges. Care must be taken when handling the various components to avoid
personal injury. Wear gloves when handling. The unit is heavy and awkward to move around. Two
people should work together to lift the unit into the cutout in your island.
TOOLS REQUIRED:
Work gloves
Safety glasses
Phillips screwdriver
Flat-blade screwdriver
7/16” wrench
Level
Tape measure
Inspect the product to verify that there is no shipping damage. If any damage is detected, call the shipper
and initiate a damage claim. Hestan Commercial Corp. is not responsible for shipping damage. DO NOT
discard any packing material (box, pallet, straps) until the unit has been inspected.
Remove all exterior packaging materials, banding, tape, etc. Remove all protective film from the inside of
your product. You may leave any exterior protective film on until after installation is complete.
CONFIGURATIONS
Your new Hestan Refreshment Center / Insulated Sink is offered in 4 different configurations, as well
as a separate Ice Bin accessory. Other accessories are available for purchase to further customize your
product. Please visit the Hestan website (www.hestanhome.com), or contact your Hestan dealer for
more information.
GIS30 GISHS30 AGIB
©2018 Hestan Commercial Corporation
2
EN
1. Consult the end of this instruction manual to determine the appropriate cutout dimensions for your
product. The Hestan Refreshment Center / Insulated Sink is designed for outdoor use and features
corrosion-resistant stainless steel construction. The faucet (GRC & GRCHS models) is also made of
stainless steel and is outdoor-rated.
Some provision must be made in the island for fresh water supply and proper drainage of the sink. It is
recommended that the product be installed by a qualified technician or plumber in accordance with all
local building and plumbing codes.
As seen in this typical installation, Hestan Access Doors are mounted underneath the Refreshment
Center & Ice Bin to allow access to the plumbing underneath. This is not a requirement and your
professional outdoor equipment designer or installer may find another way to access this area.
2. Installation instructions for the faucet are packed in the carton with the faucet itself. It may be easier
to mount the faucet before installing the sink. The large 3-1/2” hole in the sink can accommodate
a standard basket strainer (not included), or a food-waste disposer (not included). Your qualified
technician or plumber should install this item before mounting the sink.
INSTALLATION


Produkt Specifikationer

Mærke: Hestan
Kategori: Ikke kategoriseret
Model: GRC30

Har du brug for hjælp?

Hvis du har brug for hjælp til Hestan GRC30 stil et spørgsmål nedenfor, og andre brugere vil svare dig




Ikke kategoriseret Hestan Manualer

Hestan

Hestan GFDSL241 Manual

30 August 2024
Hestan

Hestan GRWSR24 Manual

30 August 2024
Hestan

Hestan GFDSL242 Manual

30 August 2024
Hestan

Hestan AGIJ36 Manual

30 August 2024
Hestan

Hestan GRC30 Manual

30 August 2024
Hestan

Hestan AGIJ30 Manual

30 August 2024
Hestan

Hestan AGIJ42 Manual

30 August 2024
Hestan

Hestan GRWGL24 Manual

30 August 2024
Hestan

Hestan Aspire 20 Manual

24 August 2024

Ikke kategoriseret Manualer

Nyeste Ikke kategoriseret Manualer