LUCIDA FabCore FC-3303 Manual

LUCIDA Ikke kategoriseret FabCore FC-3303

Læs gratis den danske manual til LUCIDA FabCore FC-3303 (14 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 2 personer og har en gennemsnitlig bedømmelse på 4.6 stjerner ud af 1.5 anmeldelser. Har du et spørgsmål om LUCIDA FabCore FC-3303, eller vil du spørge andre brugere om produktet?

Side 1/14
Product Information
L V T F L O O R I N G
Installation Guide
Care & Maintenance
Warranty Information
2 | Product Information
Part 1. Installation Guide
Thank you for choosing a Lucida product. When properly installed and cared for, your new ooring
will be easy to maintain and keep its great look for years.
warranty.
WARNING!
Your old Floors may contain Asbestos!
DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL,
SAW, BEAD-BLAST OR MECHANICALLY CHIP OR
PULVERIZE PREVIOUSLY INSTALLED EXISTING
RESILIENT FLOORING, BACKING, LINING FELT,
ASPHALTIC “CUTBACK” ADHESIVES OR OTHER
ADHESIVES, AS THESE PRODUCTS MAY CONTAIN
ASBESTOS FIBERS AND/OR CRYSTALLINE
SILICA.
Avoid creating dust when removing
existing ooring and adhesive.
Inhalation of such dust is a cancer
and respiratory tract hazard.
Smoking by individuals exposed to
asbestos bers greatly increases
the risk of serious bodily harm.
Unless positively certain that the
product is a non-asbestos-containing
material, you must presume it
contains asbestos. Regulations may
require that the material be tested
to determine asbestos content and
may govern the removal and disposal
of material. See current edition of
the Resilient Floor Covering Institute
(RFCI) publication Recommended Work
Practices for Removal of Resilient Floor
Coverings for detailed information
and instructions on removing all
resilient covering structures.
TOOLS REQUIRED:
Tape Measure, 100 lb. Roller, Square Ruler,
Chalk Line, Utility Knife
I. GENERAL PREPARATIONS
Commercial glue down LVT should be
stored, installed, and maintained in a
climate-controlled indoor location between
65° - 85°F.
Always check the cartons to assure the
pattern number is correct. Work from 2 to 3
cartons at a time, mixing the planks during
the installation.
Inspection of ooring material prior to
installation is required. Any defects should
be immediately reported to the supplier
from which the ooring was purchased
before installation. Lucida Surfaces will not
be responsible for labor costs to repair or
replace material with defects that were
apparent before or noticed at the end of an
installation.
Check if suboor/site conditions comply with
the specications described below. If you are
not satised, do not install, and contact your
supplier.
Flooring products can be damaged by
rough handling before installation. Exercise
care when handling and transporting these
products. Store, transport and handle the
ooring planks in a manner to prevent any
damage. Store cartons at, never on edge.
Flooring products can be heavy and bulky.
Always use proper lifting techniques when
handling these products. Whenever possible,
make use of material-handling equipment
such as dollies or material carts. Never lift
more than you can safely handle.
Ensure that moisture tests have been
conducted and that the results do not exceed
the acceptable moisture limit for the adhesive
used.
LVT ooring MUST be allowed to acclimate


Produkt Specifikationer

Mærke: LUCIDA
Kategori: Ikke kategoriseret
Model: FabCore FC-3303

Har du brug for hjælp?

Hvis du har brug for hjælp til LUCIDA FabCore FC-3303 stil et spørgsmål nedenfor, og andre brugere vil svare dig