BDI Mirage 8224 Manual

BDI Ikke kategoriseret Mirage 8224

Læs gratis den danske manual til BDI Mirage 8224 (4 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 43 personer og har en gennemsnitlig bedømmelse på 5.0 stjerner ud af 22 anmeldelser. Har du et spørgsmål om BDI Mirage 8224, eller vil du spørge andre brugere om produktet?

Side 1/4
1
Mirage is engineered for easy assembly. Carefully follow this procedure
to prevent any damage.
Placement and Maintenance
Mirage is designed for indoor use on level floors. Clean glass with glass
cleaner; steel parts and wood veneer with a moist cloth.
Step 1
Unpack and Identify
Unpack and identify the components at left. Note that some components
are shipped inside the cabinet. The assembly workspace should be a non-
marring surface such as carpet. For missing hardware pieces, please
contact BDI Customer Service at customerservice@bdiusa.com. For all
other concerns, please contact your BDI Retailer.
Step 2
Remove Pre-Installed Adjustable Shelves (L)
Component List
Designed by Al Glass and Cristian Wicha.
These distinctive product configurations are protected by US and international
patents, trade dress, and/or copyright laws.
BDI are trademarks of Becker Designed, Inc.
All Rights reserved. ©2009, BDI
Made in China. 080709v1
MIRAGE
8224
A S S E M B L Y I N S T R U C T I O N S
BDIUSA COM BDIUSA COM. CUSTOMERSERVICE@ .
C - Dowel Pin x 8
F - Leg Assembly
x 2
L - Assembled Cabinet
x 1
E - Cam Fastener x 2
D - Cam Bolt x 2
G - Front Rail x 1
H - M6 x 70mm Bolt x 4
I - M6 x 73mm Bolt x 2
J - Barrel Nut x 6
Pre-installed on M6 x
70mm Bolt (H) and M6
x 73mm Bolt (I)
B - 4mm Hex Driver
x 1
A - Phillips Screwdriver
x 1
K - Center Leg x 1
N - Back Panel x 2
M - Adjustable Shelf
x 2
L
2ASSEMBLY INSTRUCTIONS
BDIUSA CUSTOMERSERVICE BDIUSA.COM @ .COM
Step 3
Build Base Assembly
Press Dowel Pins (C) into place at indicated locations near ends of
Front Rail (G) Cam Bolts (D), then install at indicated locations using
provided Phillips Screwdriver (A). Then join the Front
Rail (G) and Leg Assemblies (F) together,
aligning holes for Cam Bolts (D) and Dowel
Pins (C).
Once Dowel Pins (C) and Cam Bolts (D)
are fully inserted into the respective holes,
fasten together by inserting Cam Fastener
(E) and turning it approximately one-half
turn clockwise using
Phillips Screwdriver (A).
Step 4
Install Base Assembly and Center Leg
With Assembled Cabinet (L) resting safely on its back surface,
press Dowel Pins (C) into place at six (6) indicated locations of
cabinet bottom. Then install built Base
Assembly to Cabinet bottom using
M6 x 70mm Bolts (H) and Barrel
Nuts (J), and tighten with Phillips
Screwdriver (A). Next install Center
Leg (K) to Cabinet bottom using M6 x
73mm Bolts (I) and Barrel Nuts (J),
and tighten with Phillips Screwdriver
(A).
NOTE: As are Barrel Nuts (J)
preinstalled on ends of M6 x 70mm
Bolts (H) and M6 x 73mm Bolts
(I), first loosen and remove Barrel
Nuts from Bolts Bolts , then insert
through the Base Assembly and
Center Leg from bottom, fastening
into place with from Barrel Nuts
the top (inside cabinet).
E
C
D
F
G
H
H
H
H
I
I
C
CC
C
C
C
I
I


Produkt Specifikationer

Mærke: BDI
Kategori: Ikke kategoriseret
Model: Mirage 8224

Har du brug for hjælp?

Hvis du har brug for hjælp til BDI Mirage 8224 stil et spørgsmål nedenfor, og andre brugere vil svare dig