TOOLS REQUIRED FOR INSTALLATION
• Air Purifier (1X)
• Hybrid Filters w/ Pre-Filter (1X)
• 16ft mounting cables with clutches (4X)
• Centering Blocks (4X)
• User Manual (1X)
• Gloves
• Ladder/Step Stool
• Straight or 90° Conduit Connector
• Wire Nuts
• Level
• Tape
• Two adjacent, unobstructed 24” x 24” drop ceiling tiles with at least 18”
clearance above the drop ceiling
• Mounting hooks or location installed to local code and capable of holding
the weight of the system
• For ease of installation and optimal placement of unit in the grid, it is
HIGHLY RECOMMENDED that either hooks be drilled into the ceiling, or strut
channels be used to loop cables if there are no existing mounting points
available above the perimeter of the housing.
PACKAGING CONTENTS
NOTE: Two people are required, three people recommended, for
easy and proper installation.
NOTE: We recommend removing additional adjacent ceiling tiles for
easiest installation.
NOTE: It is required to remove one cross-tee in the ceiling grid.
NOTE: Do not install next to a return or register.
NOTE: Shut off circuit breaker to installation area before
beginning installation.
INSTALLATION INSTRUCTIONS
Before beginning installation, ensure that a
qualified electrician has run a 120V circuit
to the installation area. Remove unit from
packaging and stage on a tabletop or other
surface under or near installation area with
door facing upwards.
Open unit door by depressing the latch button
and pulling upward. Have one person hold
the door open while filter and hardware are
removed.
NOTE: Do not remove corrugate support trays
attached to the door yet.
Disengage the filter clamp lever until a click
is heard.
NOTE: Locking/ unlocking motions are in
opposite directions between left and right
filter changing mechanisms.
123