Festo VABM-B10-25E-G12-7-P3 Manual

Festo Ikke kategoriseret VABM-B10-25E-G12-7-P3

Læs gratis den danske manual til Festo VABM-B10-25E-G12-7-P3 (1 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 12 personer og har en gennemsnitlig bedømmelse på 4.4 stjerner ud af 6.5 anmeldelser. Har du et spørgsmål om Festo VABM-B10-25E-G12-7-P3, eller vil du spørge andre brugere om produktet?

Side 1/1
Assembly instructions (Original instructions)
8069056
1702b
[8069058]
†‡
Connection block
VABM-B10-25E
Festo SE & Co. KG
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
1. Applicable documents
All available documents on the product www.
festo.com/pk
2. Safety
Switch off compressed air before mounting work.
Observe tigh
tening torques.
3. Intended use
Pneuma
tic linking of the valves.
4. Further inf
o
rmation
Accessories for VABM www.fes
to.com/catalogue
5. Scope of delivery
20518d_1
VABM-B10-25E-...
1 Connection block
2 Screw M4x50
1)2)
3 Seal
1)2)
4 Seal
1)
5 Blanking plug B-1/2
6 Blanking plug B-1/8
(1x)
(nx)
(nx)
(nx)
(3x)
(2x)
20518d_2
VABM-B10-25E-...-P3
1 Connection block
2 Screw M4x50
1)2)
3 Seal
1)
4 Seal
1)
5 Blanking plug B-1/2
6 Blanking plug B-1/8
(1x)
(nx)
(nx)
(nx)
(2x)
(1x)
6. Not in scope of d
e
livery
20520d_3
7 Solenoid valve
VUVS-... or
pneumatic valve
VUWS-...
1)
8 Screw set
1)
VAME-B10-25-S
only for VUVS-LK…-S,
with screws
ISO 4762-M4x40-8.8
(nx)
(nx)
20518d_13
1)
The number of screws , seals 2 8/3 4/ and valves 7 is dependent on the available
valve positions.
2)
Number = 2 x available valve positions
7. Mounting of blanking plugs 5
5
5
55/6
6
6
66
20518d_5
Screw in the blanking
plugs 5 6/ at the desired
position, as required.
Blanking plug [Nm]
58.5 _ 15 %
6 5.0 – 20 %
8. Mounting of connection block 1
1
1
11
20518d_6
Place connection block 1
on mounting surface (A).
Tighten screws (B).
9. Alignment of seal 4
4
4
44
20518d_11
For valves VUVS-L/LT...:
Place the seal 4 in the
depression of the valve 7
so it is positive-locking.
Observe channel
designation 1/3/5 or 1/3.
20
51
8d_12
For valves VUVS-LK...-S:
Place seal 4 on the
valve 7. Observe channel
designation 1/3/5 or 1/3.
Indexing hole (X) on the
valve 7 is:
Only relevant for connection
block VABM-B10-25E-...
Hidden after alignment
of the seal 4.
10. Mounting of valve 7
7
7
77
Information
Screws 8 can only be mounted with solenoid valves 7 VUVS-LK…-S.
Seals 3 can only be mounted for solenoid valves 7 with external pilot air
supply.
20518d_7
/Push screws 2 8 into the
drill holes of the valve 7.
Only screws 2 are loss-
protected.
Insert seals 3 into the
orifices (C). Rotating
movement required during
mounting.
Position valve 7 on the
connection block 1.
Check:
Projection (D) is in the
slot (E)
Valve 7 is aligned parallel
to the surface (F)
Channel designations 1/3/5
or 1/3 agree with each
other.
Tighten screws 2 8/ .
3 Nm _ 20 %
1
1
5
6
2
4
1
5
6
2
4
A
B
7
4
3
C
E
1
F
5
6
7
4
D
315
3
3
2
/
8
7
4
C
315
X
X
X
7
8


Produkt Specifikationer

Mærke: Festo
Kategori: Ikke kategoriseret
Model: VABM-B10-25E-G12-7-P3

Har du brug for hjælp?

Hvis du har brug for hjælp til Festo VABM-B10-25E-G12-7-P3 stil et spørgsmål nedenfor, og andre brugere vil svare dig




Ikke kategoriseret Festo Manualer

Ikke kategoriseret Manualer

Nyeste Ikke kategoriseret Manualer

Kimo

Kimo LR 110 Manual

2 September 2025
HMS Premium

HMS Premium LPD02 Manual

2 September 2025
AVer

AVer E1008 Manual

2 September 2025
Biltema

Biltema 17-547 Manual

2 September 2025
Groen

Groen AH/1E Manual

2 September 2025
ACOPower

ACOPower HY-P30 Manual

2 September 2025
Globe

Globe RG30 Manual

2 September 2025
Neutrik

Neutrik NLT4FXX Manual

2 September 2025