
Sinks manufactured by ADVANCE TABCO
are designed and constructed for the use of
liquid containment. Suggested applications include Food Preparation, Manufacturing,
Cooking, Laboratory and Service and the like. ADVANCE TABCO
product use for activities employing harsh and active chemicals. Please consult factory
regarding unusual applications.
CHECK FOR CONCEALED DAMAGE
FILE CLAIM WITH DELIVERING FREIGHT CARRIER
© ADVANCE TABCO, OCTOBER 2018
Installation Instructions for
19-18 SERIES & WSS SERIES SINKS
Suggested Rough-In Plumbing Dimensions
Adjust the tubular wall support brackets and flanges
to proper alignment. Loosen or tighten each flange
to sit snug against the wall and secure to wall using
screws (Not Included) . Be sure to go (Figure 4)
back and hand tighten the set screws at this time.
Contact Customer Service at:
customer@advancetabco.com
19-18-1-ADA 19-18-1-EFADA N/A
19-18-40/19-18-40-ADA 19-18-40EF/19-18-40EFADA 19-18-40KV/19-18-40KV
19-18-60/19-18-60-ADA 19-18-60EF/19-18-60EFADA 19-18-60KV/19-18-60KV
19-18-80/19-18-80-ADA 19-18-80EF/19-18-80EFADA 19-18-80KV/19-18-80KV
19-18-100/19-18-100-ADA 19-18-100EF/19-18-100EFADA 19-18-100KV/19-18-100KV
19-18-120/19-18-120-ADA 19-18-120EF/19-18-120EFADA 19-18-120KV/19-18-120KV
WSS-14-21/WSS-16-25 WSS-14-21EF/WSS-16-25EF WSS-14-21KV/WSS-16-25KV
INSTALLING KNEE VALVES FOR KV SERIES
Knee Valves can be installed before or after sink is
mounted to the wall. Attach each Knee Valve onto the
sink by fitting into existing stud welded screws found
Use supplied nuts to secure valve(s) to sink. Tighten with
7/16” open end wrench (Figure 5).
Connect supply lines to knee valve(s) and supply line(s)
from knee Valve(s) to Faucet(s). Connect drain(s).
WARNING: Equipment that includes a faucet may expose you to chemicals, including lead, that are known to the
State of California to cause cancer or birth defects or other productive harm. For more Info.,visit www.p65warnings.ca.gov.re