2
The Intellinet 8-Port Gigabit Ethernet Layer 2+ Web-Managed Industrial Switch with 2 SFP Ports offers
an array of time-saving, cost-effective features while providing superior network throughput.
Features
• Provides RJ45 data connections for up to eight network devices
• IP30 slim-type metal housing to withstand harsh industrial conditions
• Wide operating temperature: -40 – 85°C (-40 – 185°F)
• Option for DIN-rail installation
• Two small form-factor pluggable GBIC module slots (SFP)
• Two redundant DC inputs (44 – 57 V) with I/O terminal block
With a backplane speed of 20 Gbps, plenty of performance is available for your computers, servers
and other networking devices. Each of the ports automatically senses the link speed of the connected
network device and adjusts to 10, 100 or 1000 Mbps for compatibility and maximum performance.
For the user manual and specifications, visit intellinetnetwork.com. Register your product
at register.intellinet-network.com/r/508834 or scan the QR code on the cover.
LEDs
LED Color Status Status Description
PWR Green On Power on
Off Power off; abnormal power
PWR1 &
PWR 2 Green On PWR input has power
Off Power is off or is working abnormally
Link/ACT
1 – 8
Green
(10/100 Mbps)
On Valid port connection (10/100 Mbps)
Blinking Sending or receiving data
Off No link established or port is connected at 1000 Mbps speed
Speed Green
(1000 Mbps)
On Valid port connection (1000 Mbps)
Off No link established or port is connected at 10/100 Mbps speed
SFP
1 & 2 Green
On Valid port connection
Blinking Sending or receiving data
Off No link established
Cat5e/6/6a UTP/STP cables provide optimal performance; if a status LED doesn’t indicate
a link or activity, check the corresponding device for proper setup and operation.
Power
Terminal Block Installation
NOTE: Ensure all power is off/disconnected before beginning!
1 Loosen appropriate screws.
2 Insert bare power-supply wires into appropriate terminal slots (positive
wire into positive slot; negative wire into negative slot).
3 Tighten appropriate screws to secure wires. (If desired, repeat steps 1 – 3 on second input pair.)
4 Install block into the device and tighten screws.
English
Instructions