Læs gratis den danske manual til Pulsar Observatories Rigel Observatory Automation (29 sider) i kategorien Ikke kategoriseret. Denne vejledning er vurderet som hjælpsom af 18 personer og har en gennemsnitlig bedømmelse på 4.9 stjerner ud af 9.5 anmeldelser. Har du et spørgsmål om Pulsar Observatories Rigel Observatory Automation, eller vil du spørge andre brugere om produktet?

Side 1/29
[Type text] Page 1
OBSERVATORY INSTALLATION / USER GUIDES
Installation of a Pulsar Observatory takes approximately 3 hours for 2 persons. Extreme
care should be taken when aligning the dome panels, as once they have been joined with
silicone sealant; it is very dicult to separate them. The door, with lock, is p -installed in re
the wall panel.
CONTENTS:
Observatory base requirements
PAGE 2-4
Observatory installation guide
PAGE 5-10
Installing your protective rubber ooring
PAGE 12-13
Accessory bay installation guide
PAGE 14
Motor drive installation guide
PAGE 15-26
Additional notes
Parts List
PAGE 27
PAGE 28
FOR TECHNICAL SUPPORT CALL +44(0)1366 315006
Useful links:
https://www.pulsarastro.com/video-guides- -w.asp27
https://www.pulsarastro.com/
[Type text] Page 2
OBSERVATORY BASE REQUIREMENTS
For best results your observatory should be bolted to a concrete hard standing. This can be prepared by
yourself or you can employ a local builder / tradesman to do the work for you.
We always recommend using one of our Pulsar Astro steel piers for mounting
your telescope. This will not only give you a rock solid permanent alignment
for your telescope mount, but also will allow you to dispense with the tripod,
which takes up valuable oor space, and prevents you from accidentally
kicking one of the legs!
Your concrete base will need a substantial central block of concrete to take the
weight of your telescope setup, to provide a really solid footing.
This block needs to be 1000mm x 1000mm square, with a minimum depth of
600mm, positioned in the centre of your base. This will allow ample
movement for osetting the pier if required. In an ideal situation it can be
isolated from the surrounding oor, although this not entirely necessary for a
solid foundation.
The dimensions and specications for concrete hard standing base are as follows:
2.2M OBSERVATORY 2400mm square or circular.
2.7M OBSERVATORY 3000mm square or circular.
The base is best raised above ground level by at least 50mm to assist drainage, and needs to be as at and
level as possible to ensure good dome performance. Also, as stated above, it can be square or circular in
shape.
Obviously, the square base is easier to produce, using straight lengths of timber shuttering.
The overall depth of the base should be a minimum depth of 150mm.


Produkt Specifikationer

Mærke: Pulsar Observatories
Kategori: Ikke kategoriseret
Model: Rigel Observatory Automation

Har du brug for hjælp?

Hvis du har brug for hjælp til Pulsar Observatories Rigel Observatory Automation stil et spørgsmål nedenfor, og andre brugere vil svare dig




Ikke kategoriseret Pulsar Observatories Manualer

Ikke kategoriseret Manualer

Nyeste Ikke kategoriseret Manualer