Sungrow SH6.0RT Manual


Læs nedenfor 📖 manual på dansk for Sungrow SH6.0RT (137 sider) i kategorien Batterioplader. Denne guide var nyttig for 40 personer og blev bedømt med 4.5 stjerner i gennemsnit af 2 brugere

Side 1/137
3–Phase Hybrid Inverter
User Manual
SH5.0RT/SH6.0RT/SH8.0RT/SH10RT
SH5.0_6.0_8.0_10RT-UEN-Ver18-202201
I
All Rights Reserved
All Rights Reserved
No part of this document can be reproduced in any form or by any means without the prior
written permission of Sungrow Power Supply Co., Ltd (hereinafter "SUNGROW").
Trademarks
and other Sungrow trademarks used in this manual are owned by
SUNGROW.
All other trademarks or registered trademarks mentioned in this manual are owned by their
respective owners.
Software Licenses
It is prohibited to use data contained in firmware or software developed by SUNGROW,
in part or in full, for commercial purposes by any means.
It is prohibited to perform reverse engineering, cracking, or any other operations that
compromise the original program design of the software developed by SUNGROW.
II
About This Manual
The manual mainly contains the product information, as well as guidelines for installation,
operation, and maintenance. The manual does not include complete information about the
photovoltaic (PV) system. Readers can get additional information at www.sungrowpower.
com or on the webpage of the respective component manufacturer.
Validity
This manual is valid for the following model of low-power grid-connected PV string inverters:
• SH5.0RT
• SH6.0RT
• SH8.0RT
• SH10RT
It will be referred to as "inverter" hereinafter unless otherwise specified.
Target Group
This manual is intended for professional technicians who are responsible for installation, op-
eration, and maintenance of inverters, and users who need to check inverter parameters.
The inverter must only be installed by professional technicians. The professional technician
is required to meet the following requirements:
Know electronic, electrical wiring and mechanical expertise, and be familiar with electri-
cal and mechanical schematics.
Have received professional training related to the installation and commissioning of elec-
trical equipment.
Be able to quickly respond to hazards or emergencies that occur during installation and
commissioning.
Be familiar with local standards and relevant safety regulations of electrical systems.
Read this manual thoroughly and understand the safety instructions related to
operations.
How to Use This Manual
Please read this manual carefully before using the product and keep it properly at a place
for easy access.
All contents, pictures, marks, and symbols in this manual are owned by SUNGROW. No part
of this document may be reprinted by the non-internal staff of SUNGROW without written
authorization.
Contents of this manual may be periodically updated or revised, and the actual product pur-
chased shall prevail. Users can obtain the latest manual from support.sungrowpower.com
or sales channels.
III
Symbols
This manual contains important safety instructions, which are highlighted with the following
symbols, to ensure personal and property safety during usage, or to help optimize the prod-
uct performance in an efficient way.
Please carefully understand the meaning of these warning symbols to better use the manual.
Indicates high-risk potential hazards that, if not avoided, may lead to death or seri-
ous injury.
Indicates moderate-risk potential hazards that, if not avoided, may lead to death or
serious injury.
Indicates low-risk potential hazards that, if not avoided, may lead to minor or mod-
erate injury.
Indicates potential risks that, if not avoided, may lead to device malfunctions or fi-
nancial losses.
“NOTE” indicates additional information, emphasized contents or tips that may be
helpful, e.g., to help you solve problems or save time.
V
Contents
All Rights Reserved .....................................................................................................I
About This Manual......................................................................................................II
1 Safety .................................................................................................................1
1.1 Unpacking and Inspection ...............................................................................1
1.2 Installation Safety ...........................................................................................1
1.3 Electrical Connection Safety............................................................................2
1.4 Operation Safety ............................................................................................4
1.5 Maintenance Safety ........................................................................................4
1.6 Disposal Safety ..............................................................................................5
2 Product Description ..........................................................................................6
2.1 System Introduction ........................................................................................6
2.2 Product Introduction........................................................................................6
2.3 Symbols on the Product ..................................................................................8
2.4 LED Indicator .................................................................................................9
2.5 DC Switch......................................................................................................9
2.6 PV Energy Storage System (PV ESS) ............................................................10
2.6.1 PV ESS Introduction............................................................................10
2.6.2 Declaration For Back-Up Function ........................................................ 11
2.6.3 Energy Management ........................................................................... 11
2.7 Parallel System ............................................................................................13
2.7.1 Grid-connected Parallel System ...........................................................13
2.7.2 Off-grid Parallel System.......................................................................15
2.8 Retrofitting the Existing PV System................................................................ 18
3 Function Description ......................................................................................21
3.1 Safety Function ............................................................................................21
3.1.1 Protection...........................................................................................21
3.1.2 Earth Fault Alarm ................................................................................ 21
3.2 Energy Conversion and Management ............................................................21
3.2.1 Power Derating ...................................................................................21
3.2.2 DRM (“AU”/“NZ”).................................................................................22
3.2.3 Regular Operational Voltage Range .....................................................22
VIII
8.9.2 Fault Alarm Record .............................................................................96
8.10 More..........................................................................................................97
8.10.1 System Parameters........................................................................... 98
8.10.2 Running Time ...................................................................................99
8.10.3 Regular Parameters .......................................................................... 99
8.10.4 Off-grid Parameters ......................................................................... 100
8.10.5 Active Power Regulation.................................................................. 100
8.10.6 Reactive Power Regulation.............................................................. 101
8.10.7 Battery Discharge Time ................................................................... 102
8.10.8 Battery Forced Charge Time ............................................................ 102
8.10.9 Load Control ................................................................................... 103
8.10.10 Communication Parameters ........................................................... 105
8.10.11 Firmware Update ........................................................................... 105
8.10.12 Grounding Detection...................................................................... 106
8.10.13 Parallel Configuration .................................................................... 107
8.10.14 Frequency Shift Power Control ....................................................... 107
8.10.15 Energy Management Mode ............................................................108
8.10.16 MicroGrid System Parameters........................................................ 109
8.10.17 DO Configuration .......................................................................... 110
9 System Decommissioning .......................................................................... 111
9.1 Decommissioning the Inverter ..................................................................... 111
9.1.1 Disconnecting the Inverter ................................................................. 111
9.1.2 Dismantling the Inverter..................................................................... 111
9.1.3 Disposal of the Inverter...................................................................... 112
9.2 Decommissioning the Battery ...................................................................... 112
10 Troubleshooting and Maintenance .......................................................... 113
10.1 Troubleshooting........................................................................................ 113
10.2 Maintenance ............................................................................................ 118
10.2.1 Maintenance Notices ....................................................................... 118
10.2.2 Routine Maintenance....................................................................... 119
10.2.3 Replacing the Button Cell................................................................. 119
11 Appendix ...................................................................................................... 120
11.1 Technical Data.......................................................................................... 120
11.2 The Compatibility for Backup under Off-grid Scenario .................................. 125
11.3 Quality Assurance..................................................................................... 126
11.4 Contact Information................................................................................... 126
1
1Safety
When installing, commissioning, operating, and maintaining the product, strictly observe the
labels on the product and the safety requirements in the manual. Incorrect operation or work
may cause:
Injury or death to the operator or a third party;
Damage to the product and other properties.
The safety instructions in this manual are only supplements and cannot cover
all the precautions that should be followed. Perform operations considering ac-
tual on-site conditions.
SUNGROW shall not be held liable for any damage caused by violation of gen-
eral safety operation requirements, general safety standards, or any safety in-
struction in this manual.
When installing, operating, and maintaining the product, comply with local laws
and regulations. The safety precautions in this manual are only supplements
to local laws and regulations.
1.1 Unpacking and Inspection
Check all safety signs, warning labels and nameplates on devices.
Ensure that the safety signs, warning labels and nameplates must be clearly visible
and cannot be removed or covered before the device is decommissioned.
After receiving the product, check whether the appearance and structural parts of
the device are damaged, and check whether the packing list is consistent with the
actual ordered product. If there are problems with the above inspection items, do
not install the device and contact SUNGROW in time.
1.2 Installation Safety
Make sure there is no electrical connection before installation.
Before drilling, avoid the water and electricity wiring in the wall.
3
Batteries deliver electric power, resulting in burns or a fire hazard when they are
short circuited, or wrongly installed.
Lethal voltages are present at the battery terminals and cables connecting to the
inverter. Severe injuries or death may occur if the cables and terminals in the inver-
ter are touched.
Damage to the product caused by incorrect wiring is not covered by the warranty.
Electrical connection must be performed by professionals.
All cables used in the PV generation system must be firmly attached, properly
insulated, and adequately dimensioned.
Check the positive and negative polarity of the PV strings, and connect the PV con-
nectors to corresponding terminals only after ensuring polarity correctness.
During the installation and operation of the inverter, please ensure that the positive
or negative poles of PV strings do not short-circuit to the ground. Otherwise, an
AC or DC short-circuit may occur, resulting in equipment damage. The damage
caused by this is not covered by the warranty.
Comply with the safety instructions related to PV strings and the regulations re-
lated to the local grid.
User Manual 1 Safety
5
To avoid the risk of electric shock, do not perform any other maintenance opera-
tions beyond this manual. If necessary, contact SUNGROW for maintenance. Oth-
erwise, the losses caused is not covered by the warranty.
Improper settings or maintenance can permanently damage the battery.
Incorrect inverter parameters will lead to the premature aging of battery.
1.6 Disposal Safety
Please scrap the inverter in accordance with relevant local regulations and stand-
ards to avoid property losses or casualties.
User Manual 1 Safety
6
2Product Description
2.1 System Introduction
The inverter must only be operated with PV strings with class II protection in ac-
cordance with IEC 61730, application class A. It is not allowed for the positive
pole or the negative pole of the PV strings to be grounded. This can cause the
inverter to be destroyed.
Do not connect any local load between the inverter and the AC circuit breaker.
For the TT utility grid, the N line voltage to ground must be 30 V or less.
The inverter applies only to the scenarios described in this manual.
The three-phase hybrid inverters are applicable to both on-grid and off-grid PV systems.
With the integrated Energy Management System (EMS), they can control and optimize the
energy flow so as to increase the self-consumption of the system.
2.2 Product Introduction
Model Description
The model description is as follows (take SH10RTas an example):
Appearance
The image shown here is for reference only. The actual product received may differ.
9
Symbol Explanation
Danger to life due to high voltages!
Only qualified personnel can open and service the inverter.
Do not touch live parts for 10 minutes after disconnection from
the power sources.
Additional grounding point.
2.4 LED Indicator
The LED indicator on the front of the inverter indicates the working state of the inverter.
table 2-1 LED indicator description
LED indicator LED state Definition
Blue
ON The inverter is running in the on/off-grid mode.
Twinkling The inverter is at standby or startup state
(without on/off-grid operation).
Red
ON A system fault has occurred.
Gray
OFF Both the AC and DC sides are powered down.
Voltage may still be present in AC side circuits after the indicator is off. Pay atten-
tion to the electricity safety during operating.
2.5 DC Switch
The DC switch is used to safely disconnect the DC circuit whenever necessary.
User Manual 2 Product Description


Produkt Specifikationer

Mærke: Sungrow
Kategori: Batterioplader
Model: SH6.0RT

Har du brug for hjælp?

Hvis du har brug for hjælp til Sungrow SH6.0RT stil et spørgsmål nedenfor, og andre brugere vil svare dig




Batterioplader Sungrow Manualer

Sungrow

Sungrow SG40CX-P2 Manual

27 Januar 2025
Sungrow

Sungrow SH8.0RT Manual

18 November 2024
Sungrow

Sungrow SH5.0RT Manual

18 November 2024
Sungrow

Sungrow SH6.0RT Manual

18 November 2024
Sungrow

Sungrow IDC180E Manual

3 September 2024

Batterioplader Manualer

Nyeste Batterioplader Manualer