Tycon Systems RPAL48-180-1000 Manual

Tycon Systems Solpanel RPAL48-180-1000

Læs gratis den danske manual til Tycon Systems RPAL48-180-1000 (4 sider) i kategorien Solpanel. Denne vejledning er vurderet som hjælpsom af 16 personer og har en gennemsnitlig bedømmelse på 4.5 stjerner ud af 8.5 anmeldelser. Har du et spørgsmål om Tycon Systems RPAL48-180-1000, eller vil du spørge andre brugere om produktet?

Side 1/4
RPAL48-180- xxxx
200W RemotePro
Wireless Base Stations
and Client Devices
Surveillance Cameras
Remote Control
Remote Lighting
Off Grid Electronics
Congratulations! on your purchase of the RemotePro 200W
Remote Power System. Please take a moment to review this
Qwik Install Guide before use.
Operation Modes: Solar Only operation or Solar with AC/DC
Backup.
Key Features: Industrial Strength, Manageable, 24VDC and
48VDC Output, 7 Gigabit Passive PoE ports, 2.25A Aux Port,
48V 20A MPPT Solar, Automated Alerts, Removable Connec-
tions.
Safety: For your own protection, follow these safety rules.
Perform as many functions as possible on the ground
Do not attempt to install on a rainy, windy or snowy day or if
there is ice or snow accumulation at the install site or if the
site is wet.
Make sure there are no people, pets, etc. below if you are
working on a roof or ladder.
Recommended Tools: Phillips and Small Flat Blade Screwdriv-
ers, 6mm Hex key and 13, 19, 27, 34mm Wrenches
Please help preserve the environment and return
any used batteries to an authorized depot
2
Qwik Install
STEP 1: Select install location where southern sky has no obstructions
that could cause shading on solar panels.
STEP 2: Pour a foundation big enough to hold solar mount anchors
and also provide level support for battery box. See detailed instructions
in solar mount instructions.
STEP 3: Assemble solar array with mount using solar mount instruc-
tions.
STEP 4: Place battery box under solar panels facing towards back of
solar panels. Install 8 batteries in the box in an alternating pattern. Use
rope tied to battery tabs to lower batteries into the box. Connect all 8
batteries in series configuration (Positive to Negative to Positive...)
STEP 5: Install DIN rail to enclosure using the two screws provided.
Install MPPT solar controller to DIN Rail. Remove the Large Green
Connector from the unit.
STEP 6: Find the thermocouple cable that came with the MPPT Solar
Controller and connect the side with the ring lug to one of the batteries
positive or negative terminals, it doesn t matter which one. Connect the
battery cable to the Large Green Connector battery inputs and then to
the batteries making sure to observe the proper polarity.
STEP 7: Install the cable glands in the back of the enclosure and route
the long solar panel cables through the cable gland and connect to the
large green connector solar (PV) inputs. A four panel system will use
two of the long cables and a two panel system will use one of the long
cables. You can shorten the cables as necessary for a cleaner install.
You can also lengthen the cables by adding additional lengths of
12AWG cable.
STEP 8: Connect two of the solar panels in series (Positive to Nega-
tive) by plugging the positive from panel 1 to the negative of panel 2
and then connect the long solar cable to the remaining positive and 20’


Produkt Specifikationer

Mærke: Tycon Systems
Kategori: Solpanel
Model: RPAL48-180-1000

Har du brug for hjælp?

Hvis du har brug for hjælp til Tycon Systems RPAL48-180-1000 stil et spørgsmål nedenfor, og andre brugere vil svare dig