DUAL HINGED SINGLE HINGED
Single Sided Dual Sided DOORS DOORS
PRV15 PRVF15 PRD15
PRV12 PRVF12 PRD12 PRSHD12
PRV10 PRVF10 PRD10
PRV8 PRVF8 PRD8 PRSHD8
PRV6 PRVF6 PRD6 PRSHD6
All PatchRunner Managers and Dual Hinged Doors are available in 96" tall versions
6 inch and 12 inch wide PatchRunner Managers and Dual Hinged Doors are also available in
(PRV**96, PRVF**96, and PRD**96) **= 6,8,10,12,or 15 inch wide
79" tall versions (PRV679, PRVF679, PRD679, PRV1279, PRVF1279, PRV1279)
Recommended bolt placement for mounting
manager to rack channel.
Middle Location
Bolt
(For Front Only Manager
& Front & Rear Manager)
Top Location
Bolt
(For Front Only & Front & Rear
Manager)
Bottom Location
Bolt and Spacer
(For Front Only Manager)
Bolt
(For Front & Rear Manager)
(1) P R ATCH UNNER Vertical Cable Manager
(6) 1/2-13 Hex Nuts
(6) 1/2-13x2.0” Bolts
(12) Washers for 1/2-13 bolts
(4) Spools
(2) .91 long 1/2-13 Bolt Spacers
* Spools sold separately for PRV6 & PRVF6
Page 1 of 4
P R ATCH UNNER Vertical Cable Manager
LOCATION GUIDE - STANDARD EIA RACK
CONTENTS
After the first rack is mounted to the floor with the
appropriate hardware, Use Three 1/2-13x2.0” bolts
(supplied with the vertical cable manager panels) to
fasten the PATCHRUNNER Vertical Cable Manager
to the rack. Next, mount the second rack to the
other side of the PATCHRUNNER Vertical Cable
Manager using the remaining 1/2-13x2.0” bolts. Then
mount the second rack to the floor using the appropriate
hardware.
Center Mounting of a P RATCH UNNER on Standard EIA Rack
Spacer
Note:
Tighten bolts to 120 lbs.-in.
Signifies Bottom
6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
15 “Vertical Manager dimensions shown in brackets {...}
PART NUMBERS